جۆری نموونەکۆدتاقیکردنەوەنرخ (دینار)ماوەوردەکاری
Base Course Crushed Lime Stone 10-6-3 Crushed Surfaces
بەشی خاك
6,000 3-5 Days
Base Course Crushed Lime Stone 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
Base Course Crushed Lime Stone 13-1 SO3
بەشی خاك
14,500 3-5 Days
Base Course Crushed Lime Stone 13-21 Soundness
بەشی خاك
46,000 3-5 Days
Base Course Crushed Lime Stone 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
Base Course Crushed Lime Stone 14-4 T.S.S
بەشی خاك
11,000 3-5 Days
Base Course Crushed Lime Stone 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
Base Course Crushed Lime Stone 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
Base Course Crushed Lime Stone 6-34 Distribution
بەشی خاك
8,250 3-5 Days
Base Course Crushed Lime Stone 6-35 Test definition
بەشی خاك
4,750 3-5 Days
Base Course Crushed Lime Stone 6-8 Liquid Limit
بەشی خاك
14,000 3-5 Days
Base Course Crushed Lime Stone 9-1 Gradation
بەشی خاك
17,500 3-5 Days
Base Course Crushed Lime Stone 9-10 Gradation Lime Stone
بەشی خاك
18,000 3-5 Days
Base Course Crushed Lime Stone 9-16 Dividing
بەشی خاك
11,000 3-5 Days
Base Course Crushed Lime Stone 9-17 Correction
بەشی خاك
50,000 3-5 Days
Base Course Crushed Lime Stone 9-18 Drying
بەشی خاك
30,000 3-5 Days
Base Course Crushed Lime Stone 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
Base Course Crushed Lime Stone 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
Base Course Crushed Lime Stone 9-5 Flakiness
بەشی خاك
9,250 3-5 Days
Base Course Crushed Lime Stone 9-6 MDD
بەشی خاك
19,250 3-5 Days
Base Course Crushed Lime Stone 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
Base Course Crushed Lime Stone 9-8 CBR
بەشی خاك
25,000 3-5 Days
Field Density 11-1-2 Sand Cone-Field Density
بەشی خاك
14,500 3-5 Days
Field Density 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
Field Density 11-6 Nuclear -Field Density
بەشی خاك
10,500 3-5 Days
Field Density 4-14-6 Equipment Transportation (More than 50) km
بەشی خاك
47,750 3-5 Days
Field Density 5-14-1 Reposition
بەشی خاك
2,250 3-5 Days
Field Density 5-14-2 Equipment transportation 1-10 km
بەشی خاك
11,750 3-5 Days
Field Density 5-14-3 Equipment transportation -Lab Vehicles
بەشی خاك
97,000 3-5 Days
Field Density 5-14-4 Equipment transportation 10-50km
بەشی خاك
44,250 3-5 Days
Field Density 6-1 Moisture Content
بەشی خاك
6,000 3-5 Days
Field Density 9-14 Nuclear Moisture Content
بەشی خاك
7,750 3-5 Days
Field Density 9-16 Dividing
بەشی خاك
11,000 3-5 Days
Field Density 9-17 Correction
بەشی خاك
50,000 3-5 Days
Field Density 9-6 MDD
بەشی خاك
19,250 3-5 Days
Field Density 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
Field Density Nuclear 1-14-5 Reposition (No. of Point 1)
بەشی خاك
2,250 3-5 Days
Field Density Nuclear 2-14-5 Equipment Transportation (1-10)km
بەشی خاك
11,750 3-5 Days
Field Density Nuclear 4-14-5 Equipment Transportation (10-50)km
بەشی خاك
44,250 3-5 Days
Field Density Nuclear 4-14-6 Equipment Transportation (More than 50)km
بەشی خاك
47,750 3-5 Days
Field Density Nuclear 6-11 Nuclear-Field Density
بەشی خاك
10,500 3-5 Days
Field Density Nuclear 9-14 Moisture Content on Site
بەشی خاك
7,750 3-5 Days
Filling - پڕکردنەوە 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
Filling - پڕکردنەوە 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
Filling - پڕکردنەوە 14-1 SO3
بەشی خاك
23,000 3-5 Days
Filling - پڕکردنەوە 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
Filling - پڕکردنەوە 14-4 TSS
بەشی خاك
11,000 3-5 Days
Filling - پڕکردنەوە 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
Filling - پڕکردنەوە 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
Filling - پڕکردنەوە 6-34 Distribution
بەشی خاك
8,250 3-5 Days
Filling - پڕکردنەوە 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
Filling - پڕکردنەوە 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
Filling - پڕکردنەوە 9-1 Gradation
بەشی خاك
17,500 3-5 Days
Filling - پڕکردنەوە 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
Filling - پڕکردنەوە 9-17 Correction
بەشی خاك
50,000 3-5 Days
Filling - پڕکردنەوە 9-18 Drying
بەشی خاك
30,000 3-5 Days
Filling - پڕکردنەوە 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
Filling - پڕکردنەوە 9-6 MDD
بەشی خاك
19,250 3-5 Days
Filling - پڕکردنەوە 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
Filling - پڕکردنەوە 9-8 CBR
بەشی خاك
25,000 3-5 Days
Granular Behind Structure 9-1 Gradation
بەشی خاك
17,500 3-5 Days
Granular Behind Structure 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
Granular Behind Structure 9-18 Drying
بەشی خاك
30,000 3-5 Days
Granular Behind Structure 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
Natural Ground - زەوی سروشتی 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
Natural Ground - زەوی سروشتی 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
Natural Ground - زەوی سروشتی 14-1 SO3
بەشی خاك
23,000 3-5 Days
Natural Ground - زەوی سروشتی 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
Natural Ground - زەوی سروشتی 14-4 TSS
بەشی خاك
11,000 3-5 Days
Natural Ground - زەوی سروشتی 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
Natural Ground - زەوی سروشتی 5-11 Sampling
بەشی خاك
14,750 3-5 Days
Natural Ground - زەوی سروشتی 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
Natural Ground - زەوی سروشتی 6-34 Distribution
بەشی خاك
8,250 3-5 Days
Natural Ground - زەوی سروشتی 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
Natural Ground - زەوی سروشتی 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
Natural Ground - زەوی سروشتی 9-1 Gradation
بەشی خاك
17,500 3-5 Days
Natural Ground - زەوی سروشتی 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
Natural Ground - زەوی سروشتی 9-17 Correction
بەشی خاك
50,000 3-5 Days
Natural Ground - زەوی سروشتی 9-18 Drying
بەشی خاك
30,000 3-5 Days
Natural Ground - زەوی سروشتی 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
Natural Ground - زەوی سروشتی 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
Natural Ground - زەوی سروشتی 9-6 MDD
بەشی خاك
19,250 3-5 Days
Natural Ground - زەوی سروشتی 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
Natural Ground - زەوی سروشتی 9-8 CBR
بەشی خاك
25,000 3-5 Days
Sub grade 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
Sub grade 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
Sub grade 14-1 SO3
بەشی خاك
23,000 3-5 Days
Sub grade 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
Sub grade 14-4 TSS
بەشی خاك
11,000 3-5 Days
Sub grade 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
Sub grade 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
Sub grade 6-34 Distribution
بەشی خاك
8,250 3-5 Days
Sub grade 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
Sub grade 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
Sub grade 9-1 Gradation
بەشی خاك
17,500 3-5 Days
Sub grade 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
Sub grade 9-17 Correction
بەشی خاك
50,000 3-5 Days
Sub grade 9-18 Drying
بەشی خاك
30,000 3-5 Days
Sub grade 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
Sub grade 9-6 MDD
بەشی خاك
19,250 3-5 Days
Sub grade 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
Sub grade 9-8 CBR
بەشی خاك
25,000 3-5 Days
SUB-Base Course Crushed Gravel 10-6-3 Crushed Surfaces
بەشی خاك
6,000 3-5 Days
SUB-Base Course Crushed Gravel 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
SUB-Base Course Crushed Gravel 13-1 SO3
بەشی خاك
14,500 3-5 Days
SUB-Base Course Crushed Gravel 13-21 Soundness
بەشی خاك
46,000 3-5 Days
SUB-Base Course Crushed Gravel 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
SUB-Base Course Crushed Gravel 14-4 T.S.S
بەشی خاك
11,000 3-5 Days
SUB-Base Course Crushed Gravel 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
SUB-Base Course Crushed Gravel 2-1-2 Washing-OLD
بەشی خاك
4,000 3-5 Days
SUB-Base Course Crushed Gravel 5-11 Sampling
بەشی خاك
14,750 3-5 Days
SUB-Base Course Crushed Gravel 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
SUB-Base Course Crushed Gravel 6-34 Distribution
بەشی خاك
8,250 3-5 Days
SUB-Base Course Crushed Gravel 6-35 Test definition
بەشی خاك
4,750 3-5 Days
SUB-Base Course Crushed Gravel 6-8 Liquid Limit
بەشی خاك
14,000 3-5 Days
SUB-Base Course Crushed Gravel 9-1 Gradation
بەشی خاك
17,500 3-5 Days
SUB-Base Course Crushed Gravel 9-10 Gravel Gradation
بەشی خاك
18,000 3-5 Days
SUB-Base Course Crushed Gravel 9-16 Dividing
بەشی خاك
11,000 3-5 Days
SUB-Base Course Crushed Gravel 9-17 Correction
بەشی خاك
50,000 3-5 Days
SUB-Base Course Crushed Gravel 9-18 Drying
بەشی خاك
30,000 3-5 Days
SUB-Base Course Crushed Gravel 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
SUB-Base Course Crushed Gravel 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
SUB-Base Course Crushed Gravel 9-6 MDD
بەشی خاك
19,250 3-5 Days
SUB-Base Course Crushed Gravel 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
SUB-Base Course Crushed Gravel 9-8 CBR
بەشی خاك
25,000 3-5 Days
SUB-Base Course Type A Covered 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type A Covered 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
SUB-Base Course Type A Covered 14-1 SO3
بەشی خاك
23,000 3-5 Days
SUB-Base Course Type A Covered 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
SUB-Base Course Type A Covered 14-4 TSS
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type A Covered 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
SUB-Base Course Type A Covered 5-11 Sampling
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type A Covered 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
SUB-Base Course Type A Covered 6-34 Distribution
بەشی خاك
8,250 3-5 Days
SUB-Base Course Type A Covered 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
SUB-Base Course Type A Covered 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
SUB-Base Course Type A Covered 9-1 Gradation
بەشی خاك
17,500 3-5 Days
SUB-Base Course Type A Covered 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type A Covered 9-17 Correction
بەشی خاك
50,000 3-5 Days
SUB-Base Course Type A Covered 9-18 Drying
بەشی خاك
30,000 3-5 Days
SUB-Base Course Type A Covered 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type A Covered 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
SUB-Base Course Type A Covered 9-5 Flakiness
بەشی خاك
9,250 3-5 Days
SUB-Base Course Type A Covered 9-6 MDD
بەشی خاك
19,250 3-5 Days
SUB-Base Course Type A Covered 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type A Covered 9-8 CBR
بەشی خاك
25,000 3-5 Days
SUB-Base Course Type A Uncovered 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type A Uncovered 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
SUB-Base Course Type A Uncovered 14-1 SO3
بەشی خاك
23,000 3-5 Days
SUB-Base Course Type A Uncovered 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
SUB-Base Course Type A Uncovered 14-4 TSS
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type A Uncovered 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
SUB-Base Course Type A Uncovered 5-11 Sampling
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type A Uncovered 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
SUB-Base Course Type A Uncovered 6-34 Distribution
بەشی خاك
8,250 3-5 Days
SUB-Base Course Type A Uncovered 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
SUB-Base Course Type A Uncovered 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
SUB-Base Course Type A Uncovered 9-1 Gradation
بەشی خاك
17,500 3-5 Days
SUB-Base Course Type A Uncovered 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type A Uncovered 9-17 Correction
بەشی خاك
50,000 3-5 Days
SUB-Base Course Type A Uncovered 9-18 Drying
بەشی خاك
30,000 3-5 Days
SUB-Base Course Type A Uncovered 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type A Uncovered 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
SUB-Base Course Type A Uncovered 9-5 Flakiness
بەشی خاك
9,250 3-5 Days
SUB-Base Course Type A Uncovered 9-6 MDD
بەشی خاك
19,250 3-5 Days
SUB-Base Course Type A Uncovered 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type A Uncovered 9-8 CBR
بەشی خاك
25,000 3-5 Days
SUB-Base Course Type B Covered 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type B Covered 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
SUB-Base Course Type B Covered 14-1 SO3
بەشی خاك
23,000 3-5 Days
SUB-Base Course Type B Covered 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
SUB-Base Course Type B Covered 14-4 TSS
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type B Covered 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
SUB-Base Course Type B Covered 5-11 Sampling
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type B Covered 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
SUB-Base Course Type B Covered 6-34 Distribution
بەشی خاك
8,250 3-5 Days
SUB-Base Course Type B Covered 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
SUB-Base Course Type B Covered 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
SUB-Base Course Type B Covered 9-1 Gradation
بەشی خاك
17,500 3-5 Days
SUB-Base Course Type B Covered 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type B Covered 9-17 Correction
بەشی خاك
50,000 3-5 Days
SUB-Base Course Type B Covered 9-18 Drying
بەشی خاك
30,000 3-5 Days
SUB-Base Course Type B Covered 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type B Covered 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
SUB-Base Course Type B Covered 9-5 Flakiness
بەشی خاك
9,250 3-5 Days
SUB-Base Course Type B Covered 9-6 MDD
بەشی خاك
19,250 3-5 Days
SUB-Base Course Type B Covered 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type B Covered 9-8 CBR
بەشی خاك
25,000 3-5 Days
SUB-Base Course Type B Uncovered 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type B Uncovered 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
SUB-Base Course Type B Uncovered 14-1 SO3
بەشی خاك
23,000 3-5 Days
SUB-Base Course Type B Uncovered 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
SUB-Base Course Type B Uncovered 14-4 TSS
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type B Uncovered 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
SUB-Base Course Type B Uncovered 5-11 Sampling
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type B Uncovered 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
SUB-Base Course Type B Uncovered 6-34 Distribution
بەشی خاك
8,250 3-5 Days
SUB-Base Course Type B Uncovered 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
SUB-Base Course Type B Uncovered 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
SUB-Base Course Type B Uncovered 9-1 Gradation
بەشی خاك
17,500 3-5 Days
SUB-Base Course Type B Uncovered 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type B Uncovered 9-17 Correction
بەشی خاك
50,000 3-5 Days
SUB-Base Course Type B Uncovered 9-18 Drying
بەشی خاك
30,000 3-5 Days
SUB-Base Course Type B Uncovered 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type B Uncovered 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
SUB-Base Course Type B Uncovered 9-5 Flakiness
بەشی خاك
9,250 3-5 Days
SUB-Base Course Type B Uncovered 9-6 MDD
بەشی خاك
19,250 3-5 Days
SUB-Base Course Type B Uncovered 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type B Uncovered 9-8 CBR
بەشی خاك
25,000 3-5 Days
SUB-Base Course Type C Covered 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type C Covered 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
SUB-Base Course Type C Covered 14-1 SO3
بەشی خاك
23,000 3-5 Days
SUB-Base Course Type C Covered 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
SUB-Base Course Type C Covered 14-4 TSS
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type C Covered 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
SUB-Base Course Type C Covered 5-11 Sampling
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type C Covered 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
SUB-Base Course Type C Covered 6-34 Distribution
بەشی خاك
8,250 3-5 Days
SUB-Base Course Type C Covered 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
SUB-Base Course Type C Covered 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
SUB-Base Course Type C Covered 9-1 Gradation
بەشی خاك
17,500 3-5 Days
SUB-Base Course Type C Covered 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type C Covered 9-17 Correction
بەشی خاك
50,000 3-5 Days
SUB-Base Course Type C Covered 9-18 Drying
بەشی خاك
30,000 3-5 Days
SUB-Base Course Type C Covered 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type C Covered 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
SUB-Base Course Type C Covered 9-5 Flakiness
بەشی خاك
9,250 3-5 Days
SUB-Base Course Type C Covered 9-6 MDD
بەشی خاك
19,250 3-5 Days
SUB-Base Course Type C Covered 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type C Covered 9-8 CBR
بەشی خاك
25,000 3-5 Days
SUB-Base Course Type C Uncovered 11-1-4 Compensation
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type C Uncovered 13-57 Gypsum
بەشی خاك
14,500 3-5 Days
SUB-Base Course Type C Uncovered 14-1 SO3
بەشی خاك
23,000 3-5 Days
SUB-Base Course Type C Uncovered 14-2 Organic Material
بەشی خاك
7,500 3-5 Days
SUB-Base Course Type C Uncovered 14-4 TSS
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type C Uncovered 14-6 CaCO3
بەشی خاك
13,000 3-5 Days
SUB-Base Course Type C Uncovered 5-11 Sampling
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type C Uncovered 6-10 Plastic Limit
بەشی خاك
7,750 3-5 Days
SUB-Base Course Type C Uncovered 6-34 Distribution
بەشی خاك
8,250 3-5 Days
SUB-Base Course Type C Uncovered 6-35 Test Definition
بەشی خاك
4,750 3-5 Days
SUB-Base Course Type C Uncovered 6-8 Liquid Limit (LL)
بەشی خاك
14,000 3-5 Days
SUB-Base Course Type C Uncovered 9-1 Gradation
بەشی خاك
17,500 3-5 Days
SUB-Base Course Type C Uncovered 9-16 Dividing the sample
بەشی خاك
11,000 3-5 Days
SUB-Base Course Type C Uncovered 9-17 Correction
بەشی خاك
50,000 3-5 Days
SUB-Base Course Type C Uncovered 9-18 Drying
بەشی خاك
30,000 3-5 Days
SUB-Base Course Type C Uncovered 9-2 Washing on 200
بەشی خاك
4,000 3-5 Days
SUB-Base Course Type C Uncovered 9-4 Abrasion
بەشی خاك
24,000 3-5 Days
SUB-Base Course Type C Uncovered 9-5 Flakiness
بەشی خاك
9,250 3-5 Days
SUB-Base Course Type C Uncovered 9-6 MDD
بەشی خاك
19,250 3-5 Days
SUB-Base Course Type C Uncovered 9-7 MDD 4\"
بەشی خاك
14,750 3-5 Days
SUB-Base Course Type C Uncovered 9-8 CBR
بەشی خاك
25,000 3-5 Days
تحریات التربة 5-14-9a (5-14-9a)Internal site exploration-lab vehicles
بەشی خاك
50,000 3-5 Days
تحریات التربة 5-14-9b Internal site exploration-customer vehicles 5-14-9b
بەشی خاك
30,000 3-5 Days
تحریات التربة 6-1 (Moisture Content (6-1
بەشی خاك
6,000 3-5 Days
تحریات التربة 6-10 (6-10)Plastic limit
بەشی خاك
7,750 3-5 Days
تحریات التربة 6-11 (6-11)Shrinkage limit
بەشی خاك
11,000 3-5 Days
تحریات التربة 6-12 (6-12)Shrinkage limit coefficient
بەشی خاك
2,500 3-5 Days
تحریات التربة 6-13 (6-13)Specific gravity
بەشی خاك
14,000 3-5 Days
تحریات التربة 6-14 (6-14)UC Undisturbed
بەشی خاك
10,500 3-5 Days
تحریات التربة 6-15 (6-15)UC Remolded
بەشی خاك
12,250 3-5 Days
تحریات التربة 6-17 (6-17)UC Hard soil
بەشی خاك
14,000 3-5 Days
تحریات التربة 6-18 (6-18)One dimensional consolidation
بەشی خاك
19,750 3-5 Days
تحریات التربة 6-18 (6-18)Elasticity coefficient
بەشی خاك
4,750 3-5 Days
تحریات التربة 6-2 (6-2) Wet Density
بەشی خاك
7,500 3-5 Days
تحریات التربة 6-20 (6-20)Swelling
بەشی خاك
9,500 3-5 Days
تحریات التربة 6-21 (6-21)Free Swelling
بەشی خاك
10,000 3-5 Days
تحریات التربة 6-22 (6-22)Constant head permeability
بەشی خاك
16,250 3-5 Days
تحریات التربة 6-23 (6-23)Falling head permeability
بەشی خاك
16,250 3-5 Days
تحریات التربة 6-24 (6-24)Direct shear-cohesionless soil
بەشی خاك
6,500 3-5 Days
تحریات التربة 6-25 (6-25)Direct shear-cohesion soil
بەشی خاك
10,000 3-5 Days
تحریات التربة 6-26 (6-26)Direct shear
بەشی خاك
8,750 3-5 Days
تحریات التربة 6-27 (6-27)Triaxial-cohesionless soil
بەشی خاك
12,250 3-5 Days
تحریات التربة 6-28 (6-28)Triaxial-cohesion soil
بەشی خاك
17,000 3-5 Days
تحریات التربة 6-29 (6-29)Triaxial
بەشی خاك
14,750 3-5 Days
تحریات التربة 6-3 (6-3) Dry Density
بەشی خاك
6,500 3-5 Days
تحریات التربة 6-30 (6-30)Drained Triaxial
بەشی خاك
14,500 3-5 Days
تحریات التربة 6-31 (6-31)Fan Test
بەشی خاك
6,500 3-5 Days
تحریات التربة 6-32 (6-32)Hydrometer
بەشی خاك
25,250 3-5 Days
تحریات التربة 6-33 (6-33)Swelling-swelling device
بەشی خاك
17,000 3-5 Days
تحریات التربة 6-34 (6-34)Dividing
بەشی خاك
8,250 3-5 Days
تحریات التربة 6-35 (6-35)Test Definition
بەشی خاك
4,750 3-5 Days
تحریات التربة 6-4 (6-4)Sieve analysis
بەشی خاك
12,250 3-5 Days
تحریات التربة 6-5 (6-5)Hydrometer analysis
بەشی خاك
21,000 3-5 Days
تحریات التربة 6-6 (6-6)Sieve no.200
بەشی خاك
7,000 3-5 Days
تحریات التربة 6-7 (6-7)Liquid limit-1 point
بەشی خاك
11,250 3-5 Days
تحریات التربة 6-8 (6-8)Liquid limit-3 points
بەشی خاك
14,000 3-5 Days
تحریات التربة 6-9 (6-9)Liquid limit-con pentration
بەشی خاك
7,500 3-5 Days
تحریات التربة 8-17-1 (8-17-1)Equipment transportation-internal
بەشی خاك
50,000 3-5 Days
تحریات التربة 8-17-3 (8-17-3)Internal site equipment-lab vehicles
بەشی خاك
30,000 3-5 Days