Sample typeCodeTestPrice (IQD)TimeDetails
Irregularity 11-5-2 Irregularity test per 100 m
Asphalt Section
258,000 3-5 Days
Irregularity 5-14-4 Staff transport
Asphalt Section
44,250 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-1 Penetration (ASTM D5)
Asphalt Section
7,500 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-10 Solubility (ASTM D2042)
Asphalt Section
16,500 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-2 Ductility (ASTM D113)
Asphalt Section
9,250 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-20 Elastic recovery (ASTM D6084)
Asphalt Section
18,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-3 Softening point (ASTM D36)
Asphalt Section
8,250 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-4 Flash & fire point (ASTM D92)
Asphalt Section
10,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-5 Rolling thin-film oven — RTFOT (ASTM D2872)
Asphalt Section
13,500 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-1-8 Mass loss on RTFOT (ASTM D2872)
Asphalt Section
8,250 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-8-1 Mixing / sample preparation
Asphalt Section
50,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-8-10 Bending beam rheometer — BBR (ASTM D6648)
Asphalt Section
175,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-8-2 Dividing
Asphalt Section
10,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-8-6 Rotational viscosity (ASTM D4402)
Asphalt Section
25,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-8-7 Dynamic shear rheometer — DSR (ASTM D7175)
Asphalt Section
100,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-8-8 Pressure aging vessel — PAV (ASTM D6521)
Asphalt Section
650,000 3-5 Days
Performance Grade for Bitumen Test (PG / PMB) 10-8-9 Degassing (ASTM D6521)
Asphalt Section
75,000 3-5 Days
ئایزوگام 10-7-1 Tensile Strength
Asphalt Section
5,000 3-5 Days
ئایزوگام 10-7-2 Elongation
Asphalt Section
3,000 3-5 Days
ئایزوگام 10-7-3 Thermal Stability
Asphalt Section
10,000 3-5 Days
ئایزوگام 10-7-4 Dimension
Asphalt Section
2,000 3-5 Days
ئایزوگام 10-7-5 Weight
Asphalt Section
2,000 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 10-1-14 Dividing
Asphalt Section
4,000 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 10-6-6 Marshall Density
Asphalt Section
7,750 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 10-6-7 Sample preparation
Asphalt Section
8,750 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 10-6-8 Stability&Flow
Asphalt Section
8,250 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 10-6-9 Specific Gravity
Asphalt Section
13,000 3-5 Days
ئەسفەلت بایندەر 3/4 ئینچ - قەیوان 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 10-1-14 Dividing
Asphalt Section
4,000 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 10-6-2 Gradation
Asphalt Section
18,250 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 10-6-6 Marshall Density
Asphalt Section
7,750 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 10-6-7 Sample preparation
Asphalt Section
8,750 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 10-6-8 Stability&Flow
Asphalt Section
8,250 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 10-6-9 Specific Gravity
Asphalt Section
13,000 3-5 Days
ئەسفەلت ستابلایزەر 1.0 ئینچ- قەیوان 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 10-1-14 Dividing
Asphalt Section
4,000 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 10-6-6 Marshall Density
Asphalt Section
7,750 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 10-6-7 Sample preparation
Asphalt Section
8,750 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 10-6-8 Stability&Flow
Asphalt Section
8,250 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 10-6-9 Specific Gravity
Asphalt Section
13,000 3-5 Days
ئەسفەلت ستابلایزەر 1.5 ئینچ- قەیوان 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
ئەسفەلت سێرفيس 10-1-14 Dividing
Asphalt Section
4,000 3-5 Days
ئەسفەلت سێرفيس 10-6-2 Gradation
Asphalt Section
18,250 3-5 Days
ئەسفەلت سێرفيس 10-6-3 Crushed surfaces
Asphalt Section
6,000 3-5 Days
ئەسفەلت سێرفيس 10-6-5 Bitumen Content
Asphalt Section
16,250 3-5 Days
ئەسفەلت سێرفيس 10-6-6 Marshall Density
Asphalt Section
7,750 3-5 Days
ئەسفەلت سێرفيس 10-6-7 Sample preparation
Asphalt Section
8,750 3-5 Days
ئەسفەلت سێرفيس 10-6-8 Stability &Flow
Asphalt Section
8,250 3-5 Days
ئەسفەلت سێرفيس 10-6-9 Specific Gravity
Asphalt Section
13,000 3-5 Days
ئەسفەلت سێرفيس 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
ئەسفەڵت بایندەر 10-1-14 Dividing
Asphalt Section
4,000 3-5 Days
ئەسفەڵت بایندەر 10-6-2 Gradation
Asphalt Section
18,250 3-5 Days
ئەسفەڵت بایندەر 10-6-3 Crushed Surfaces
Asphalt Section
6,000 3-5 Days
ئەسفەڵت بایندەر 10-6-5 Bitumen Content
Asphalt Section
16,250 3-5 Days
ئەسفەڵت بایندەر 10-6-6 Marshall Density
Asphalt Section
7,750 3-5 Days
ئەسفەڵت بایندەر 10-6-7 Sample Preparation
Asphalt Section
8,750 3-5 Days
ئەسفەڵت بایندەر 10-6-8 Stability& Flow
Asphalt Section
8,250 3-5 Days
ئەسفەڵت بایندەر 10-6-9 Specific Gravity
Asphalt Section
13,000 3-5 Days
ئەسفەڵت بایندەر 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
ئەسفەڵت ستابلایزەر 10-1-14 Dividing
Asphalt Section
4,000 3-5 Days
ئەسفەڵت ستابلایزەر 10-6-2 Gradation
Asphalt Section
18,250 3-5 Days
ئەسفەڵت ستابلایزەر 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
ئەسفەڵت ستابلایزەر 10-6-6 Marshall Density
Asphalt Section
7,750 3-5 Days
ئەسفەڵت ستابلایزەر 10-6-7 Sample preparation
Asphalt Section
8,750 3-5 Days
ئەسفەڵت ستابلایزەر 10-6-8 Stability&Flow
Asphalt Section
8,250 3-5 Days
ئەسفەڵت ستابلایزەر 10-6-9 Specific Gravity
Asphalt Section
13,000 3-5 Days
ئەسفەڵت ستابلایزەر 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
فلەر (ئەسفەڵت) 10-6-1 Gradation
Asphalt Section
9,250 3-5 Days
فلەر (ئەسفەڵت) 6-10 Plastci Limit (PL)
Asphalt Section
7,750 3-5 Days
فلەر (ئەسفەڵت) 6-8 Liquid Limit (LL)
Asphalt Section
14,000 3-5 Days
فلەر (ئەسفەڵت) 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
قیری شل 10-1-1 Penetration
Asphalt Section
7,500 3-5 Days
قیری شل 10-1-10 Solubility
Asphalt Section
16,500 3-5 Days
قیری شل 10-1-2 Ductility
Asphalt Section
9,250 3-5 Days
قیری شل 10-1-3 Softening Point
Asphalt Section
8,250 3-5 Days
قیری شل 10-1-4 Flash &Fire points
Asphalt Section
10,000 3-5 Days
قیری شل 10-1-5 Aging
Asphalt Section
13,500 3-5 Days
قیری شل 10-1-9 Viscosity
Asphalt Section
14,500 3-5 Days
لم (ئەسفەڵت) 10-1-17 Dividing
Asphalt Section
4,000 3-5 Days
لم (ئەسفەڵت) 13-5 Organic Material
Asphalt Section
9,500 3-5 Days
لم (ئەسفەڵت) 6-10 Plastic Limit
Asphalt Section
7,750 3-5 Days
لم (ئەسفەڵت) 6-8 Plasticity Index
Asphalt Section
14,000 3-5 Days
لم (ئەسفەڵت) 9-10 Gradation
Asphalt Section
18,000 3-5 Days
لم (ئەسفەڵت) 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-1 Penetration
Asphalt Section
7,500 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-10 Solubility
Asphalt Section
16,500 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-14 Asphalt Dividing - OLD
Asphalt Section
4,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-17 Aggregate Dividing
Asphalt Section
4,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-2 Ductility
Asphalt Section
9,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-3 Softening
Asphalt Section
8,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-4 Flash & Fire
Asphalt Section
10,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-5 Aging
Asphalt Section
13,500 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-1-9 Viscosity
Asphalt Section
14,500 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-5-8 Filler Specific Gravity
Asphalt Section
7,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-5-8 Filer Specific gravity
Asphalt Section
7,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-1 Gradation Filer
Asphalt Section
9,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-10 Mix Design
Asphalt Section
23,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-13 Material preparation
Asphalt Section
35,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-3 Crushed Surfaces
Asphalt Section
6,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-6 Marshall Density
Asphalt Section
7,750 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-7 Mold Preparation
Asphalt Section
8,750 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-8 Stability & Flow
Asphalt Section
8,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 10-6-9 Asphalt Specific Gravity
Asphalt Section
13,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 14-2 Organic Material
Asphalt Section
7,500 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 2-1-1 Loss density
Asphalt Section
9,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 6-10 Plastic Limit
Asphalt Section
7,750 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 6-8 Liquid Limit (LL)
Asphalt Section
14,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 9-10 Gradation Sand &Aggregate
Asphalt Section
18,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 9-11 Gravel Specific gravity
Asphalt Section
8,750 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 9-12 Sand Specific Gravity
Asphalt Section
11,250 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 9-4 Abrasion
Asphalt Section
24,000 3-5 Days
هاوکێشەی کۆنکریتی ئەسفەڵتی 9-5 Flakiness& Elongation
Asphalt Section
9,250 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-1-14 Dividing
Asphalt Section
4,000 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-6-2 Gradation
Asphalt Section
18,250 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-6-3 Crushed stone
Asphalt Section
6,000 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-6-5 Bitumen content
Asphalt Section
16,250 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-6-6 Marshal density
Asphalt Section
7,750 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-6-7 Sample preparation
Asphalt Section
8,750 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-6-8 Stability and Flow
Asphalt Section
8,250 3-5 Days
وێرینگ پۆلیمەر - قەیوان 10-6-9 Specific gravity
Asphalt Section
13,000 3-5 Days
وێرینگ پۆلیمەر - قەیوان 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
چەو (ئەسفەڵت) 10-1-17 Dividing
Asphalt Section
4,000 3-5 Days
چەو (ئەسفەڵت) 10-6-3 Crushed Surfaces
Asphalt Section
6,000 3-5 Days
چەو (ئەسفەڵت) 13-5 Organic Material
Asphalt Section
9,500 3-5 Days
چەو (ئەسفەڵت) 13-8 Soundness-aggregate
Asphalt Section
47,250 3-5 Days
چەو (ئەسفەڵت) 6-10 Plastic Limit
Asphalt Section
7,750 3-5 Days
چەو (ئەسفەڵت) 9-10 Gradation
Asphalt Section
18,000 3-5 Days
چەو (ئەسفەڵت) 9-2 Washing on 200
Asphalt Section
4,000 3-5 Days
چەو (ئەسفەڵت) 9-4 Los Angeles
Asphalt Section
24,000 3-5 Days
چەو (ئەسفەڵت) 9-5 Flakiness
Asphalt Section
9,250 3-5 Days
کۆڕی ئەسفەڵت 10-6-14 Thickness
Asphalt Section
4,000 3-5 Days
کۆڕی ئەسفەڵت 10-6-4 نزع طبقة من القير عن الرکام المخلوط مع القير
Asphalt Section
7,000 3-5 Days
کۆڕی ئەسفەڵت 10-6-6 Bulk Density
Asphalt Section
7,750 3-5 Days
کۆڕی ئەسفەڵت 10-6-7 Sample preparation
Asphalt Section
8,750 3-5 Days
کۆڕی ئەسفەڵت 10-6-9 specific gravity
Asphalt Section
13,000 3-5 Days
کۆڕی ئەسفەڵت 11-4-2 Cutting Core 4 in per cm
Asphalt Section
5,250 3-5 Days
کۆڕی ئەسفەڵت 11-4-3 Cutting Core 6 in per cm
Asphalt Section
7,500 3-5 Days
کۆڕی ئەسفەڵت 5-14-1 Equipment transport
Asphalt Section
2,250 3-5 Days
کۆڕی ئەسفەڵت 5-14-2 Equipment transportation 1-10 km
Asphalt Section
11,750 3-5 Days
کۆڕی ئەسفەڵت 5-14-3 Equipment transportation -Lab Vehicles
Asphalt Section
97,000 3-5 Days
کۆڕی ئەسفەڵت 5-14-4 Equipment transportation 10-50km
Asphalt Section
44,250 3-5 Days
کۆڕی ئەسفەڵت 5-14-4 Personel transport
Asphalt Section
44,250 3-5 Days
کۆڕی ئەسفەڵت 5-14-6 Equipment Transportation (More than 50) km
Asphalt Section
47,750 3-5 Days